A titanium machining quote for an overseas buyer is read by someone who cannot walk into your shop, so the quote has to answer ten questions on paper: which drawing revision you priced, what bar, what happens to the price at another quantity, who does the outside processes, which certificate and report come with the parts, which Incoterms rule and place apply, until when the price holds, when the clock starts, how the parts are packed and what is left out. This post goes through each line from the shop side, using published terms as examples of wording. It builds on our guide to quoting titanium work without losing money, which covers the cost lines themselves.

This is a shop-side post. It does not tell you what to charge. Prices, terms and delivery are yours to set and yours to agree with the buyer.

The ten lines

Quote line Question the buyer answers with it
Drawing revision priced Is this quote for my current drawing?
Stock size and form How much bar is in the price?
Setup and run time What changes if I order more?
Outside processes Who does them and what is included?
Certificate and inspection What paperwork comes with the parts?
Incoterms rule and place Who carries cost and risk, and where does it pass?
Currency and validity date Until when can I accept this price?
Lead time with its start Counted from the order or from the bar arriving?
Payment terms asked What is due, and when?
What is excluded Tooling, freight, duties, retests?

A buyer comparing three shops sets these lines side by side. A line you leave out is a line the buyer fills with the worst case. Our post on comparing quotes line by line shows the same table from the buyer’s chair.

Drawing revision and stock

Write the drawing number and revision on the quote. Buyers who work to aerospace rules read the revision first: GKN Aerospace’s first article guidance asks for the latest part revision that affects the part, and a drawing change affecting fit, form or function can bring back a full or partial first article. If you priced a revision other than the one the buyer holds, say so at the top.

State the stock size and form you priced, for example the bar diameter and cut length or the plate thickness. That one line shows the buyer whether you priced a sensible blank and gives them something to question if another shop’s number is far lower. Our posts on blank sizing and buy to fly cover why it matters.

Setup, run and quantity

Show setup and run separately, and give at least two quantities. A buyer who sees one price at one quantity cannot judge a larger order and will either guess or ask. If your terms treat repeat orders differently, say what carries over, such as program and fixture. See batch size and price breaks for how the arithmetic works.

Outside processes

Name the processor for each outside step, not only “anodize” or “heat treat”. Buyers working to published supplier terms often need to approve them: Nikon AM Synergy’s terms, for one, require written approval before a supplier outsources and apply the buyer’s terms to the sub-tier supplier. If you do not know the processor yet, say which one you will use and that you will confirm before release.

Certificate and inspection report

State the EN 10204 type you will supply. Type 2.2 reports non-specific inspection results validated by the manufacturer. Type 3.1 reports specific results validated by the manufacturer’s authorised inspection representative, independent of production. Type 3.2 adds validation by the buyer’s representative or an official inspector, as Wermac’s summary of the standard puts it. Say whether the certificate is the mill’s original or a distributor’s copy and whether it carries the heat number that is marked on your parts. Our guide to mill certificates shows what a titanium certificate should say.

Then say what inspection report comes with the parts: dimensional report for which features, sampling plan and whether a ballooned drawing is included. GKN’s guidance asks for ballooned prints with characteristic numbers and says CMM data alone is not acceptable for a positional tolerance, because the report must show the actual positional value. That is an aerospace rule, but it shows the level of detail some buyers expect to see offered up front.

Incoterms and place

Write an Incoterms rule and a named place, for example the rule with your city. The International Chamber of Commerce describes Incoterms 2020 as eleven rules that clarify the tasks, costs and risks of delivering goods from seller to buyer. Avalon’s published quote terms, for comparison, use FOB Origin with freight and insurance prepaid and added to the invoice. Choose the rule you can perform. If a delivered option is available, quote it as a separate line so the buyer sees what the freight is, instead of burying it.

Currency and validity

State the currency and a calendar expiry date. Avalon’s terms default the validity to 10 days when none is stated and require payment in US dollars; neither is a rule, but both show that buyers abroad meet very different defaults. Match your validity to your bar supplier’s price hold, as our post on quote validity explains. If the price depends on the bar price at shipment, say so on the quote.

Need a quote for this part? Get a titanium quote

Lead time and where it starts

Say where the lead time starts and where it ends. Our guide to lead time step by step shows the eight steps; a quote that names the start (order, order acknowledgement, bar arrival or first article approval) and the stop (ready to ship or delivered) avoids the most common argument. If the bar is a mill order, say so. Buyers handle a long lead time better than a missed one.

Packing, origin and the invoice

Say how parts are packed and what the crate is made of. Wood packaging in international trade falls under ISPM 15, which requires debarked wood that is heat treated or fumigated and marked; heat treatment means a core temperature of at least 56 degrees Celsius for at least 30 minutes, according to the Wikipedia summary of the standard, and plywood and wood 6 mm or thinner are exempt. Importing countries add their own rules, so state the packing you plan and ask the buyer to confirm the destination rule.

On the invoice, put the country of origin, a description with grade, quantities, unit price and currency and each charge separately. The US rule for import invoices, 19 CFR 141.86, asks for those items, and a buyer’s broker elsewhere will want the same information. If the buyer supplied fixtures or drawings that went into the part, the US rule also asks for assists to be declared, so mention them on the invoice.

Payment terms and exclusions

State what you ask the buyer to pay and when, in plain words. If you want a deposit toward bar, say so on the quote and not after the order. Then list what is excluded: tooling beyond the fixtures you named, special packaging, retests, freight and duties. Avalon’s terms, for example, say special packaging not stated in the request or contract is charged extra and that tooling developed by the shop remains its property unless the quote says otherwise. A buyer who sees the exclusions on the quote can price them; a buyer who finds them on the invoice will remember.

A shop-side checklist

  1. Drawing number and revision priced.
  2. Stock size and form.
  3. Setup and run shown separately, two quantities at least.
  4. Each outside process with its processor.
  5. EN 10204 type, heat number marking and the inspection report scope.
  6. Incoterms rule and named place.
  7. Currency and a calendar expiry date.
  8. Lead time with its start and stop.
  9. Packing and crate material.
  10. Payment terms and exclusions.

Our guide to RFQ red flags shows the other half: the enquiries to decline or clarify before a quote goes out.

Where to take this next

A quote with these ten lines takes longer to write the first time and less time every time after, because most of it is a template you fill from the drawing. Keep one version per certificate type and one per Incoterms rule you can perform.

If you cut titanium and want enquiries from buyers who send a drawing, a quantity and a destination, read the page for shops and talk to us about whether it fits your shop.

Sources

Frequently asked questions

What should a titanium machining quote for an overseas buyer include?

The drawing revision priced, the stock size and form, setup and run time, outside processes, the certificate type and inspection report, an Incoterms rule with a named place, the currency and an expiry date, lead time with its start point, packing and the exclusions. A buyer who can read ten lines like these can compare you with two other shops.

Which Incoterms rule should a shop put on a quote?

The one you can actually perform, written with a named place. Incoterms 2020 has eleven rules that set the tasks, costs and risks of delivery between seller and buyer. A rule your freight forwarder cannot handle from your location is a promise you cannot keep. Many shops start with the shop door and add delivered options on request.

Does a buyer abroad need the HS code on the quote?

It helps, though the importer is usually responsible for classification and the right code depends on the finished part and the destination. Put a description of the part, its material and the country of origin on the quote and the invoice, and let the buyer's broker confirm the code. US invoices must show country of origin, among other items.

How long should an overseas quote stay valid?

Match it to your bar supplier's price hold and write a calendar date. A published example of shop terms defaults to 10 days when none is stated. Overseas buyers often need longer to approve internally, so ask your bar supplier how long it holds a price before you offer more.