Guides / For Shops
Medical Titanium Work for Machine Shops: Cleaning, Traceability and Validation Questions

A medical device maker will judge a titanium shop as a supplier first and as a cutter second, so the shop that wins repeat medical work can answer four questions in writing before the questionnaire arrives: how are you approved, how does each lot stay traceable, how do you clean and pack, and which processes have you validated and may not change without asking. This post is the shop side of the question. Our reference page on ISO 13485 explains the standard from the buyer’s side, and our buyer guide to titanium medical parts covers grades and drawings.
This is a shop-side post. It sets no prices or terms: those are between you and the buyer, and the examples below are published terms of other companies, shown as wording and not as rules.
Who is asking and why
In the United States the Quality Management System Regulation took effect on February 2, 2026. FDA says it incorporates ISO 13485:2016 by reference and applies to finished device manufacturers that intend to commercially distribute devices. The FDA page does not say how it reaches component suppliers, so treat the supplier requirement as a contract matter and confirm it with the device maker.
The pressure on you comes through purchasing control. A RAPS chapter on quality systems says ISO 13485 clause 7.4 has specific requirements on approving suppliers, covering planning, evaluation and ongoing monitoring, with records kept, and that it takes a risk-based approach, including how much purchased product is verified. FDA’s own FAQ adds that the regulation gives the agency authority to inspect management review, quality audits and supplier audit reports. A maker that must show its supplier audits has a reason to audit you.
One published example shows what that looks like. Orthofix’s supplier quality manual asks suppliers other than service-only ones for ISO 9001 or ISO 13485 certification, asks them to sign a quality agreement when one is required, to name a quality management representative, and to support regulatory audits and unannounced audits by the maker or a notified body. Another maker may set different terms.
The questions and what a good written answer holds
| Topic | What you will be asked | What to have ready |
|---|---|---|
| Quality system | Certificate, scope and expiry, or how you meet the maker’s supplier terms | The original certificate if you hold one, or a plain statement that you do not and a description of your controls |
| Lot record | How each lot of parts ties back to a heat lot and the inspection records | A lot traveler template and one worked example with names removed |
| Mix-ups | Line clearance and changeover between jobs | A written procedure and the record sheet that proves it was followed |
| Cleaning | The cleaning route and its evidence | The route, the agents, the validation or verification data and who signs |
| Marking | Marking method and whether it comes before or after surface treatment | The drawing’s note and your sequence |
| Outside processes | Who anodizes, passivates or heat treats and under what approval | Processor names, scope pages and the order each lot follows |
| Changes | What you will tell the maker before you change | A list of changes that need a request: bar source, tooling that touches the surface, cleaning agent, site |
| Nonconformance | How you report a part that does not meet the drawing | The report form and the rule that a decision comes before shipping |
| Records | How long you keep them and where | A retention rule in your procedure, matched to the agreement |
Traceability: the record per lot
The Orthofix manual asks suppliers for a documented process for line clearance and changeovers to prevent mix-ups and keep traceability, and for a Device History Record for the manufacturing and quality documentation of each lot or batch. Reading across to a titanium shop, that is the traveler, the heat number, the inspection sheets and the outside process certificates, filed together under one lot number.
Retention is where shops are caught out. The same manual asks for records to be kept for a period equivalent to the design and expected life of the device and never less than 15 years from the date of manufacture. That is one maker’s term, and your agreement may differ, but a shop used to keeping records for a couple of years of industrial work should find out the number before it accepts the first order. Plan where the records will live and how they are backed up. Our post on heat lot segregation shows the chain from the bin to the shipment.
Cleaning and marking: what the standard says and what the maker adds
ASTM F86 is the practice for surface preparation and marking of metallic surgical implants. It notes that iron particles, ceramic media and other foreign particles can be smeared onto or embedded in the surface during forming, machining, tumbling, media blasting and marking, and that they should be removed to minimise localised corrosion. It describes chemical and electrochemical treatments that remove contaminants and restore or promote a passive surface, and says some of them are called passivation. It also says marking can come before or after surface treatment, and if it comes after, the marked area should be evaluated to see whether more treatment is needed.
For you this has three practical effects:
- Keep contact clean. Any tool, tumbling medium or media that touches titanium is a route for contamination, so the first control is which of them are allowed near medical lots.
- Do not guess the treatment. If the drawing says passivate, ask which treatment and which specification. A bare word on a drawing does not tell you what to run.
- Settle the marking order. Ask whether the mark goes on before or after the surface treatment and write the answer into the traveler.
The maker then adds its own proof. The Orthofix manual asks for a fully validated cleaning process with results for visual inspection of cleaned product, cytotoxicity, gravimetric analysis to show reduction of manufacturing materials, total organic carbon on the final rinse where appropriate, and bioburden only when the part ships sterile packaged or the maker requires it. Treat that list as an example of the evidence a maker may want, and ask your customer which tests apply. Our reference page on ASTM F86 covers how to read a drawing note.
Validation: which processes, and who decides
Validation is the step shops tend to underrate. The GHTF guidance on process validation says a process should be validated when its output cannot be verified by later monitoring or measurement, and that processing deficiencies may only appear after the part is processed further or in use. Its examples of processes that should be validated include heat treating and plating. It lists manual cutting among processes that verification can cover, and puts numerical control cutting and certain cleaning processes among those where a decision model helps. In plain terms, a dimension you can measure on every part is verified, while a surface condition or a metallurgical state you cannot measure on every part is a candidate for validation.
The guidance is nonbinding, and its own text says it must not be used to assess compliance. It still shows how a device maker thinks, and it gives you the three stages you will hear named: installation qualification, operational qualification and performance qualification. Operational qualification challenges the process parameters under worst-case conditions, and performance qualification shows the process makes acceptable product consistently.
What does the shop do with that? Write down, for each process you run on medical lots, whether you verify or validate it and why. Then ask the maker whether it expects you to validate, whether it will run the qualification with you, or whether it validates the process at its own site and you follow the parameters. The Orthofix manual says that, on a case-by-case basis, it will partner with the supplier on operational qualification and first production lot qualification, which tells you the question is worth asking.
Need a quote for this part? Get a titanium quote
Change control: what you may not change quietly
After a process is validated, a change can break the validation. GHTF lists reasons for revalidation that include a change in the process that may affect quality, a negative trend in quality indicators, a change in product design that affects the process, transfer of the process from one facility to another and a change in the application of the process. It gives a change of raw material supplier as an example that needs its effect evaluated.
The Orthofix manual turns that into a rule. After production equivalency or process validation is established, changes to materials, subcomponents or processes used on its products must be submitted through a supplier change request and approved before they are put in place. A deviation on product already made needs a deviation request before the lot ships, and rework on rejected product needs the maker’s form before it starts.
Build a short change list into your procedure so no one on the floor decides alone:
- A new bar mill or a new bar supplier
- A new cutting fluid, cleaning agent or passivation bath
- A new machine or fixture that touches the finished surface
- A new outside processor or a new site for any step
- A new tool coating or a change in the finishing sequence
- A revision to the drawing, which our post on drawing revision control covers
Gauges and measurement
Makers look at how you measure as well as what you measure. The Orthofix manual asks suppliers to perform a measurement system analysis for all new or modified gauges and test equipment, and as a guideline says gauge R&R with an error above 30 percent needs improvement unless the maker agrees otherwise. Plan to run that study on the gauges that check critical features before you quote, and to show the results at the first review.
A one-page answer pack
Before you quote medical titanium work, assemble the pack once and update it each year:
- Certificate or controls statement
- Lot traveler template and a sample record
- Line clearance procedure
- Cleaning route with its evidence
- Marking and surface treatment sequence
- Outside processor list with scope pages
- Change list
- Gauge study results for critical features
- Record retention rule
Send it with the first quote so the review starts from your answers and not from the maker’s blank questionnaire. For the paperwork that goes with a first shipment, see our first lot checklist, and for what the buyer expects to see on the quote, see what an overseas buyer expects in a titanium quote.
Where to take this next
Medical work rewards shops that treat paperwork as part of the product. If you already cut titanium and want to know whether our page for shops fits your shop, read about working with us and talk to us. We do not hold any medical certificate, and we make no claim about any shop’s registration or approvals.
Sources
- FDA, Quality Management System Regulation (QMSR): effective date, ISO 13485:2016 incorporated by reference, who is covered
- FDA, QMSR frequently asked questions: inspection of management review, quality audits and supplier audit reports
- RAPS Library, Quality Management Systems for Drugs and Devices, chapter 1 (clause 7.4 purchasing and supplier approval, risk-based approach)
- GHTF Study Group 3, Process Validation Guidance, GHTF/SG3/N99-10:2004 Edition 2 (IMDRF archive)
- ASTM F86-21(2026), surface preparation and marking of metallic surgical implants (scope and significance)
- Orthofix, Supplier Quality Manual (certification, quality agreement, device history record, cleaning validation tests, change requests, gauge studies, record retention; one maker’s published terms)
Frequently asked questions
Does a titanium machine shop need ISO 13485 to make medical parts?
It depends on the device maker. ISO 13485 puts the duty to approve and monitor suppliers on the maker, and each maker chooses how. One published supplier manual asks every supplier except service-only ones to hold ISO 9001 or ISO 13485 certification. Others audit the shop instead. The purchase order or the quality agreement says which applies to you.
What does a validated cleaning process mean for titanium parts?
It means the cleaning route has documented evidence that it works, not only a visual check on the parts that come out. One device maker's supplier manual lists visual inspection of cleaned product, cytotoxicity, gravimetric analysis, total organic carbon on the final rinse where appropriate and bioburden when the part ships sterile packaged. Your customer names the tests, so ask before you design the route.
Can I change my bar supplier or my process after the customer approves my shop?
Not without telling the customer first. One device maker's manual requires a supplier change request, approved before implementation, for any change to materials or processes used on its products. GHTF guidance lists a change of raw material supplier and a move to another facility among the reasons a process may need revalidation.
How long does a shop keep records on medical titanium parts?
The term comes from the device maker and the regulator, not from the shop. One published supplier manual asks for the design and expected life of the device and never less than 15 years from the date of manufacture. Another maker may set a different term. Write the agreed period into the quality agreement and the shop's record procedure.
Need a quote for this part?
Send the drawing. We send one itemised quote for the finished parts and reply within 24 business hours.
Get a titanium quote